Bulyard Shipbuilding Industry AD (Varna, Bulgaria) launched a 27-ton floating crane “Expert 3”.
The floating crane is 54.9 m long and 20 m wide. The court is intended for carrying out loading and unloading activity on a raid. The ship was launched, the event was accompanied by a solemn ritual and cocktail for employees and guests of the plant.
The floating crane was built by a team of Bulgarian and Ukrainian shipbuilders under the project “POSS-910.102.013” under the supervision of the Russian Maritime Register of Shipping.
“Khladotekhnika” provided a complete supply of equipment, components and materials for HVAC systems of the floating crane.
Currently, our specialists are continuing installation work on the equipment delivered on board the ship.
According to bulyard.com